Installing them parallel creates the possibility that the floor will sag.
How to lay solid wood flooring on floorboards.
As a rule of thumb the floor boards you install should cross perpendicular to the joists under the sub floor.
Remove any base or shoe molding around the perimeter of the room.
Align the edge of the board with the chalk line and drill pilot holes down through the hardwood plank and into the sub floor and joist.
Begin by selecting a long board to start the first row.
The nails or screws should be approximately 300mm apart to offer optimum stability.
Face nail each board at the point of every joist and set the nail with a nail set.
Use wood or drywall screws to attach the substrate to the floor joists.
Pick one that is straight.
Installing click together flooring or click lock hardwood flooring is an easy way to get a wood look floor without forking out the big bucks.
Starting in one corner of the room spread in excess of 2 board widths of adhesive along the starting wall sub floor using a 3mm toothed trowel.
It should be level and free from rot and other major defects.
Next lay the first row.
Flooring experts recommend installing flooring boards perpendicular to the floor joists in a house with a plywood subfloor.
Laying solid wood flooring onto existing floorboards if you ve chosen your new solid wood floor and have decided to fit it over your existing floorboards there are a couple of things you should bear in mind before you even start particularly if you re planning the project on a diy basis.
You may need to use leveling compound to even your surface.
Installing solid wood flooring onto concrete use a flexible wood to concrete adhesives such as laybond or soudal polymer.
If the sub floor above is more than 1 inch thick this rule can be bent in many.
If you locate a squeak run a long screw through the sub floor and into the joist below it.
With the floor prepped spread flooring adhesive with trowel spreading enough to work on a few rows at time so the glue doesn t dry.
Glue will typically set in about 60 minutes hold your trowel at a 45 degree angle spread the glue in small sections.